Category:Haltepunkt Sternhaus-Ramberg - Wikimedia Commons Category:Haltepunkt Sternhaus-Ramberg - Wikimedia Commons

Sternhaus ramberg harzflirt, find the best train offers from berlin to ramberg

Bremer Teich (HWN ) – Bergrat-Müller-Teich Loop from Sternhaus Ramberg | hiking Tour | Komoot

Past the Heiliger Teich "holy pond", an artificial pond, which was built on the site of a pond that was believed in the Middle Ages to have health-giving properties the line climbs through Sternhaus-Haferfeld station and continues to Sternhaus-Ramberg station.

Now the old route of the Magdeburg—Halberstadt Railway Company branched off towards Frose and the line continues along the original Selke Valley Railway.

The numerous rock cuttings that the railway must pass through demonstrate the difficulty of engineering the line. This is a balloon loop which was constructed specifically to allow heavy trains to the power station at Silberhutte from Nordhausen to continue in the direction of Silberhutte without reversing.

How to get from Nordhausen to Ander Deuna by train, plane, bus or car

Passenger services[ edit ] The route is used daily by steam trains and railcars. The Selke Valley Railway traverses a slope of 1: For the main examinations, however, the locomotives are taken to special maintenance facilities. Like the previous one, this is located in the middle of a forest.

Scheduled passenger services between Ross lynch dating who 2018 setlist and Gernrode were resumed on 3 June Although the Selke Valley Railway has some importance for regional traffic on the Quedlinburg—Gernrode section, the passengers on the other sections of the line are mostly tourists, people on excursions and hikers.

There are 11 ways to get from Nordhausen to Ander Deuna by train, plane, bus or car

Subsequently, the branch line climbs out of the narrow valley of the Selke onto the plateau of Harzgerode. This short line, the second section of the GHE, ends in Hasselfelde, also on a high plateau.

The railway supervisory authority of Saxony-Anhalt approved operations over the line on 17 February and it was opened on 4 March with festivities and special trains.

Sincethe connection to the Harz Railway has branched off here. The line runs past the halt Haltepunkt of Osterteich, next to the artificial pond of the same name, and through the Ostergrund. After Sternhaus-Ramberg station, the line descends into the valley of the Selke.

Objects nearby

Since various remaining works had to be carried out, only a few special trains operated until the start of scheduled passenger traffic on 26 June The Lindenberg—Stiege section was not initially rebuilt.

This is followed by the stations of Quedlinburg-Quarmbeck and Bad Suderode both reopened inbefore Gernrode station is reached. Harz Railway to Nordhausen Source: The extension to Quedlinburg[ edit ] Rail traffic on the standard gauge Quedlinburg—Gernrode—Ballenstedt—Frose railway ended in Gernrode after a signal box fire in Ballenstedt.

This section is the steepest in the entire network of Harz narrow gauge railways.

What is the issue?

While on the Wernigerode — Brocken railway in normal traffic steam locomotives of DR classes The number of pairs of trains operated by steam trains or diesel railcars is approximately the same in the summer timetable, with railcars predominating in the winter half-year. There are two converted diesel locomotives of class The stretch out of the northern edge of the Harz is a very varied landscape up to the high levels of the middle Harz mountains.

The line now follows the course of the river to Alexisbad. The timetable shows six pairs of trains a day between Gernrode and Quedlinburg, two of which are hauled by locomotives.

Both locomotives and motor coaches are serviced and the steam locomotives are fueled and cleaned. The connecting line to the Harz Railway runs from Stiege station up to the highest point at metres above seal level near the halt of Birkenmoor and then downhill through the Bere valley.

Find a train from Berlin to Ramberg

Other trains run between Quedlinburg or Gernrode and Alexisbad. After passing the small halt of Drahtzug, the line reaches the village of Alexisbad. The Brocken Railway traverses more elevation but does so at a shallower gradient of 1: Deutsche Bahn saw itself as no longer able to operate the line economically and the Gernrode— Frose section was closed.

Stiege Station has the smallest terminal loop of any public railway. The first section of the Selke Valley Railway ended at Harzgerode station. Alexisbad stationwhich is also the starting point of the branch to Harzgerode, lies at the end of the small town.